Toyota Corolla (E120): Short in p squib (2nd step) circuit (to ground)

Dtc b1187/55 short in p squib (2nd step) circuit (to ground)

Share this page:

Other materials:

Inspection procedure
1 Inspect skid control ecu connector(+bs terminal voltage) Disconnect the skid control ecu connector.  measure the voltage between terminals +bs (2) and gnd (1, 23) of skid control ecu harness side connector. Voltage: 10 – 14 v 2 Reconfirm dtc Check the dtc . Ok : ...

Turn signal lever
Operating instructions Right turn Lane change to the right (move the lever partway and release it) The right hand signals will flash 3 times. Lane change to the left (move the lever partway and release it) The left hand signals will flash 3 times. Left turn ■Turn signals can be oper ...

Shifting the shift lever
Vehicles without a smart key system: While the engine switch is in the “ON” position, depress the brake pedal and move the shift lever. Vehicles with a smart key system: While the engine switch is in IGNITION ON mode, depress the brake pedal and move the shift lever. When shifting the ...