Toyota Corolla (E120): Replacement
1. Remove engine under cover rh
2. Remove fan and generator v belt

3. Remove generator assy

- Disconnect the wire clamp from the wire clip on the rectifire end frame.
- remove the rubber cap and nut, and disconnect the alternator wire.
- disconnect the alternator connector.

- Remove the 2 bolts and alternator.
4. Install generator assy
Torque:
12 mm head 25 nvm (250 Kgf·cm, 18 ft·lbf)
14 mm head 54 nvm (550 Kgf·cm, 39 ft·lbf)

Other materials:
Overhaul
1. Remove generator pulley
Sst 09820–63010 (09820–06010, 09820–06020)
Hint:
Hold sst 1 – a with a torque wrench, and tighten sst 1
– b clockwise to the specified torque.
Torque: 39 nvm (398 Kgf·cm, 29 ft·lbf)
Notice:
check that sst is secured to the rotor shaft.
...
Overhaul
1. Remove repair service starter kit
Remove the nut, then disconnect the lead wire from terminal
c.
Remove the 2 screws which are used to secure the repair
service starter kit to the starter drive housing.
remove the repair service starter kit.
remove the return ...
Continuously variable transmission
(vehicles without paddle
shift switches)
Select the shift position
depending on your purpose
and situation.
Shift position purpose
and functions
P - Parking the vehicle/
starting the engine
R - Reversing
N - Neutral
(Condition in which the
power is not transmitted)
D - Normal driving*
B - Applying moderate
engine braking driving
down hills ...