Toyota Corolla (E120): Open in d squib (2nd step) circuit

Share this page:

Other materials:

Inspection procedure
1 Inspect dlc3 terminal voltage(tc terminal) Turn the ignition switch to on.  measure voltage between terminals tc and cg of dlc3. Ok: voltage: 10 – 14 v 2 Check harness and connector(dlc3 – body ground) Check for open and short circuit in harness and connector betw ...

Receiving a phone call
Answering the phone Press the off-hook switch. Refusing a call Press the on-hook switch. Receiving a call when on another call Press the off-hook switch. Pressing the off-hook switch again returns you to the previous call. Adjusting the ringtone volume when receiving a call Change the ringto ...

On–vehicle inspection
1. Inspect turn signal flasher relay circuit Disconnect the connector from the turn signal flasher relay and inspect the connector on wire harness side as shown in the chart. Standard: Connect the connector to the turn signal flasher and inspect the wire harness side connector ...