Toyota Corolla (E120): Precaution
1. Check that the battery cables are connected to the correct terminals.
2. Disconnect the battery cables when the battery is given a quick charge.
3. Do not perform tests with a high voltage insulation resistance tester.
4. Never disconnect the battery while the engine is running.
5. Check that the charging cable is tightened on terminal b of the alternator and the fuse box.
6. Do not check whether the alternator generates or not with connecting terminal f to other terminal.
Other materials:
Inspection procedure
1 Inspect transmission wire(sl)
Disconnect the transmission wire connector from the
transaxle.
measure the resistance according to the value(s) in the
table below.
Standard:
2 Check harness and connector(transmission wire – ecm)
Connect the transmission wire c ...
Engine mechanical
Preparation
Sst
Recomended tools
Ssm
Equipment
Exhaust
Preparation
Equipment
...
Circuit description
The p/t squib (rh) circuit consists of the airbag sensor assy center and seat
belt pretensioner (rh).
It causes the srs to deploy when the srs deployment conditions are satisfied.
Dtc b0130/63 is recorded when a short is detected in the p/t squib (rh) circuit.
Wiring diagram
...


