Toyota Corolla (E120): Floor shift cable transmission control shift

Replacement

Hint

: components:

1. Remove air conditioner unit assy

Hint

: refer to the instructions for removal of the air conditioner unit assy.

2. Separate air bag sensor assy center

  1.  remove the 3 bolts, separate the airbag sensor assy center.

3. Remove exhaust pipe assy

4. Remove front floor heat insulator no.1

  1.  remove the 3 nuts and heat insulator no.1.

5. Remove floor shift cable transmission control shift

  1. Remove the clip and washer, separate the top of the shift cable from the transaxle.
  2.  remove the clip, separate the shift cable from the control cable bracket.

  1. Remove the 2 nuts and clamp.

  1. Using a screwdriver, release the cable outer spring.
  2.  turn the lock, separate the shift cable from the shift lever retainer.

  1. Separate the end of the shift cable from the shift lever assy.

  1. Remove the 2 bolts and retainer from the floor.
  2.  pull out the control cable assy from the floor.

  1. Remove the retainer from the grommet.

6. Install floor shift cable transmission control shift

  1. Put the control cable assy through the floor hole and retainer.
  2.  install the retainer to the grommet.

Notice

: fit 4 projections of the grommet into 4 holes of the retainer.

  1. Install the control cable assy with the 2 bolts.

    Torque: 5.0 Nvm (51 Kgf·cm, 44 in.Vlbf)

  1. Connect the end of the shift cable to the shift lever assy.

  1. Connect the shift cable to the retainer of shift lever assy, turn the lock.

    Notice

    : the projecting part of the lock should face upward when the shift cable is installed.

  2.  install the cable outer spring to the lock.

    Notice

    : make sure that after installation the cable outer spring is moved to the place shown in the illustration.

  1. Install the clamp with the 2 nuts.

    Torque: 5.0 Nvm (51 Kgf·cm, 44 in.Vlbf)

  1. Connect the shift cable to the control cable bracket, install a new clip.
  2.  connect the shift cable to the transaxle, install the washer and clip.

7. Install front floor heat insulator no.1

  1. install the heat insulator no.1 With the 3 nuts.

    Torque: 5.5 Nvm (56 Kgf·cm, 49 in.Vlbf)

8. Install exhaust pipe assy

9. Connect air bag sensor assy center

  1. install the airbag sensor assy center with the 3 bolts.

    Torque: 17.5 Nvm (178 Kgf·cm, 13 ft·lbf)

10. Inspect srs warning light

    Share this page:

    Other materials:

    On–vehicle inspection
    1. Inspect w/receiver condenser assy  if a fin of the w/receiver condenser assy is dirty, clean it with water and dry it with compressor air. Notice: do not damage the fin of the w/receiver condenser assy.  if a fin of the w/receiver condenser assy is bent, make it straig ...

    Inspection procedure
    1 Prepare for inspection Disconnect the negative (–) terminal cable from the battery, and wait at least for 90 seconds.  remove the horn button assy .  disconnect the connector of the instrument panel passenger airbag assy .  disconnect the connector of the front sea ...

    AUX port/USB port
    Connect an iPod, USB memory device or portable audio player to the AUX port/USB port as indicated below. Press to select “iPod”, “USB” or “AUX”. Connecting using the AUX port/USB port ■ iPod Open the cover and connect an iPod using an iPod cable. Turn on the power of the i ...