Toyota Corolla (E120): Partial engine assy

Share this page:

Other materials:

Radiator assy
Replacement 1. Drain coolant 2. Separate radiator hose inlet 3. Separate radiator hose outlet 4. Separate oil cooler inlet tube no.1 5. Separate oil cooler outlet tube no.1 6. Remove radiator assy  disconnect the fan motor connector.  disconnect two clamps for wire–harness fr ...

Combination meter assy
Overhaul Hint: components: 1. Remove meter hood sub–assy 2. Remove combination meter assy Remove the screw.  disengage the 2 clips as shown in the illustration.  disconnect the connector, then remove the combination meter. 3. Remove combination meter glass Di ...

Replacement
1. Remove combination meter assembly 2. Disconnect brake master cylinder push rod clevis  remove the clip and push rod clevis pin and wave washer, and disconnect the push rod clevis from the brake pedal. 3. Remove brake pedal support sub–assy Remove the bolt from the bra ...