Toyota Corolla (E120): Charging system

Share this page:

Other materials:

Inspection procedure
1 Inspect skid control ecu connector(+bs terminal voltage) Disconnect the skid control ecu connector.  measure the voltage between terminals +bs (2) and gnd (1, 23) of skid control ecu harness side connector. Voltage: 10 – 14 v 2 Reconfirm dtc Check the dtc . Ok : ...

Inspection procedure
Hint: troubleshoot each trouble symptom in accordance with the chart below. 1 Clear dtc Connect the hand–held tester or the obd ii scan tool to the dlc 3.  turn the ignition switch on and push the hand–held tester or the obd ii scan tool main switch on.  read the dtc . ...

Inspection procedure
Hint: if different dtcs related to different systems that have terminal e2 as the ground terminal are output simultaneously, terminal e2 may be open. Read freeze frame data using the hand-held tester or the obd ii scan tool. Freeze frame data records the engine conditions when a malf ...