Toyota Corolla (E120): Open in p squib (2nd step) circuit

Dtc b1186/58 open in p squib (2nd step) circuit

Share this page:

Other materials:

Inspection procedure
1 Inspect skid control ecu connector(+bs terminal voltage) Disconnect the skid control ecu connector.  measure the voltage between terminals +bs (2) and gnd (1, 23) of skid control ecu harness side connector. Voltage: 10 – 14 v 2 Reconfirm dtc Check the dtc . Ok : ...

Transmitter battery
Replacement 1. Replace transmitter battery Notice: special caution should be taken for handling each component as they are precision electronic components. Using a screwdriver, pry out the transmitter case. Notice: do not forcibly pry out the case. Hint: tape the screwdriver tip ...

Definition of terms
Term Definition Monitor description Description of what the ecm monitors and how it detects malfunction (monitoring purpose and its details). Related dtcs Diagnostic code Typical enabling condition Preconditions that allow the ecm to detect m ...