Select “BT Pairing” using , and
perform the procedure for registering a portable player.
Inspection procedure
1 Inspect shift solenoid valve(s1)
Remove the shift solenoid valve s1.
measure the resistance according to the value(s) in the
table below.
Standard:
Connect the positive (+) battery lead to the solenoid connector
terminal, and the negative (–) battery lead to the
solenoid b ...
Circuit description
The variable valve timing (vvt) system includes the ecm, the oil control
valve (ocv) and the vvt controller.
The ecm sends a target ”duty–cycle” control signal to the ocv. This control
signal, applied to the ocv,
regulates the oil pressure supplied to the vvt controller. Camshaft timing
co ...
Disposal
Hint:
when scrapping vehicle equipped with an srs or disposing of a instrument panel
passenger airbag assy,
always first deploy the airbag in accordance with the procedure described below.
If any abnormality occurs
with the airbag deployment, contact the service dept. Of toyota motor sales,
...